CHOOSE YOUR BUILDING KIT
THE BASE BUILDING
(12′-0″ L x 12′-0″ W)
THE BASE BUILDING IS THE STARTING POINT FOR THE EZ-RECT SHELTERS SYSTEM. THE BASE BUILDING KIT INCLUDES:
(2) SIDE BASE RAILS, FRONT AND BACK BASE RAILS, (3) SIDE WALL TRUSSES, (2) REAR LEGS, (2) MID LEGS, (2) ROOF RAILS, (1) SINGLE BRACE, (1) HEADER TRUSS, (5) ROOF JOISTS & CABLE BRACING.
THE BASE BUILDING PRODUCES A BUILDING FOOTPRINT OF 12′-0″ x 12′-0″.
EXPANSION MODULE 1
(12′-0″ x 12′-0″ FRONT EXTENSION)
INSTALLED OFF THE FRONT OF THE BASE BUILDING AND INCLUDES:
(2) BASE RAIL EXTENSIONS, (2) SIDE WALL TRUSSES, (2) FRONT LEGS, (2) ROOF RAIL EXTENSIONS, SINGLE BRACE, (3) ROOF JOISTS & CABLE BRACING.
COMBINED WITH THE BASE BUILDING PRODUCES A BUILDING FOOTPRINT OF 24′-0″ x 12′-0″.
EXPANSION MODULE 2
(12′-0″ x 12′-0″ SIDE EXTENSION)
INSTALLED ON EITHER SIDE OF THE BASE BUILDING AND INCLUDES:
FRONT AND BACK BASE RAILS, SIDE BASE RAIL, SIDE & REAR WALL TRUSS, REAR AND MID LEG, ROOF RAIL, HEADER TRUSS, SINGLE BRACE, (5) ROOF JOISTS & CABLE BRACING.
COMBINED WITH THE BASE BUILDING PRODUCES A BUILDING FOOTPRINT OF 12′-0″ x 24′-0″.
EXPANSION MODULE 3
(12′-0″ x 12′-0″ FRONT EXTENSION) REQUIRES EXPANSION MODULES 1 & 2
EXPANSION MODULE 3 TIES INTO EXPANSION MODULES 1 AND 2 AND INCLUDES:
BASERAIL EXTENSION, SIDE WALL TRUSS, FRONT LEG, ROOF RAIL EXTENSION, SINGLE BRACE, (4) ROOF JOISTS & CABLE BRACING.
COMBINING THE BASE BUILDING WITH EXPANSION MODULES 1 AND 2 PRODUCES A BUILDING FOOTPRINT OF 24′-0″ x 24′-0″